- 86.4LEGITIMACY SCORE
- 90.4SAFETY SCORE
- 4+CONTENT RATING
- $8.99PRICE
What is WBS - Project Work Breakdown? Description of WBS - Project Work Breakdown 3435 chars
Manage the work breakdown structure (WBS) in the list and tree diagram. Construct the work package tree and update the estimate; import work items from MS Excel and export the work breakdown structure to PDF, Excel, and image files. Also, we can convert a work breakdown structure to a project plan file in the QuickPlan app.
The WBS is a hierarchical and incremental decomposition of the project into phases, deliverables, and work packages. It is a tree structure that shows a breakdown of the effort required to achieve a goal, such as a program, a project, and a contract.
Mobilinked WBS is THE easy-to-use WBS management app for the iPad. Using natural gestures on a clean interface makes WBS management more convenient, faster, and more efficient than ever before. Visualize and simplify the work breakdown structure in the outline and diagram view to break down work elements and determine labor, material, and total costs for each component. The app automatically adds costs up to the element hierarchy, and supports continuous and mass tracking.
The WBS can be exported to image, Excel, and PDF files AND converted to QuickPlan (https://itunes.apple.com/app/id621375878) as a project plan.
The WBS supports mass entry of work items and import of work items from an MS Excel file.
- Feature video - https://youtu.be/FZ7puht7Nao
- Support - at http://wbs.mbl.app
WBS provides a fast, intuitive and discoverable experience for users in a clean and elegant interface
- Work package maintenance - natural gestures, continuous and batch input in outline and diagram views.
- Project costing - support labor and material costs for work packages Communication - export the work breakdown structure as an image/PDF and Excel file.
- Collaboration - Share the work breakdown structure across multiple devices via email, airdrop, and third-party cloud apps.
- Project plan integration - Export to a project plan for QuickPlan.
FEATURES
- Manage work items in a text outline view and a graphical tree diagram view.
- Continuous and batch entry of work items.
- Import from MS Excel file
- Three chart layouts, AND Display as color or grayscale style.
- Color and icon
- Supports large projects (smooth interaction for 1000 task packages)
- Natural gestures (swipe left/right to adjust outline levels, tap with two fingers to collapse/expand all groups, hold and move to change order).
- Create project quotes with labor and material costs; labor costs can be entered as expenses.
- Adjust project fee rate, currency, and work package category.
- Collapse/expand specific or all groups; zoom in on a chart view.
- User interface customization options
- Share the work breakdown structure with other devices via email, airdrop, and third-party cloud apps.
- Export the outline with costs to a new project plan to QuickPlan (https://itunes.apple.com/app/id621375878).
- Export the entire work breakdown structure or a selected workgroup to an Excel file.
- Export the entire work breakdown structure or a selected workgroup to a PDF file with export customization options.
- Export the entire work breakdown structure or a selected workgroup to an image file.
- Undo and toast with voice output
- Duplicate work breakdown structure
Work breakdown structure makes work planning easy and fast, and helps estimate future project schedule by easily viewing work items and costs. The best project management app for your business on iPad.
- WBS - Project Work Breakdown App User Reviews
- WBS - Project Work Breakdown Pros
- WBS - Project Work Breakdown Cons
- Is WBS - Project Work Breakdown legit?
- Should I download WBS - Project Work Breakdown?
- WBS - Project Work Breakdown Screenshots
- Product details of WBS - Project Work Breakdown
WBS - Project Work Breakdown App User Reviews
What do you think about WBS - Project Work Breakdown app? Ask the appsupports.co community a question about WBS - Project Work Breakdown!
Please wait! Facebook WBS - Project Work Breakdown app comments loading...
WBS - Project Work Breakdown Pros
✓ What I've been looking forCompatible with desktop applications, e.g. Excel. Let's me organize and structure work efforts easily and quickly..Version: 3.2
✓ Great Brainstorming Tool for a WBS!So easy to just start listing tasks in a hierarchy. Then go back and add tentative end dates and cost estimates for labour and materials that get totalled up to the top task. Flip to list view for a nice layout of the work and pick missing tasks. Then back to chart view to fix things up. So easy. Got my project outline and cost estimate down in under an hour!.Version: 6.5
✓ WBS - Project Work Breakdown Positive ReviewsWBS - Project Work Breakdown Cons
✗ Not HappyOne understands that having spent time and money to develop an App the developer would like to maximize their returns on investment. However, breaking up what should be a single App into 3 and even selling them separately on different platforms ( IPad & Iphone) seems like taking it too far and may even considered to be bordering on greed. Together the three Apps of Goals, WBS and QuickPlan are useful but the should all be one App. Set the goals, break the structure down and the plan them. The goals App by itself is useless. QuickPlan, to a point is okay. But they should all be one and same for all platforms..Version: 3.3
✗ Not sure if the app is still supportedI purchased a suite of these apps 3 in total. They were helpful and were fairly well suited to the film and tv projects I work on. I had thought the developers would continue to refine how well the apps performed. So after a break I had several new projects to manage and started with the WBS app. Unfortunately the icon allocation function no longer works...and alas the developers website has disappeared from the web. I have been duped, so buyer beware..Version: 3.5
✗ WBS - Project Work Breakdown Negative ReviewsIs WBS - Project Work Breakdown legit?
✅ Yes. WBS - Project Work Breakdown is 100% legit to us. This conclusion was arrived at by running over 226 WBS - Project Work Breakdown user reviews through our NLP machine learning process to determine if users believe the app is legitimate or not. Based on this, AppSupports Legitimacy Score for WBS - Project Work Breakdown is 86.4/100.
Is WBS - Project Work Breakdown safe?
✅ Yes. WBS - Project Work Breakdown is quiet safe to use. This is based on our NLP analysis of over 226 user reviews sourced from the IOS appstore and the appstore cumulative rating of 4.7/5. AppSupports Safety Score for WBS - Project Work Breakdown is 90.4/100.
Should I download WBS - Project Work Breakdown?
✅ There have been no security reports that makes WBS - Project Work Breakdown a dangerous app to use on your smartphone right now.
WBS - Project Work Breakdown Screenshots
Product details of WBS - Project Work Breakdown
- App Name:
- WBS - Project Work Breakdown
- App Version:
- 6.5
- Developer:
- 皓 李
- Legitimacy Score:
- 86.4/100
- Safety Score:
- 90.4/100
- Content Rating:
- 4+ Contains no objectionable material!
- Category:
- Business, Productivity
- Language:
- App Size:
- 57.65 MB
- Price:
- $8.99
- Bundle Id:
- com.mobilinked.wbs
- Relase Date:
- 24 May 2014, Saturday
- Last Update:
- 23 April 2023, Sunday - 22:40
- Compatibility:
- IOS 12.0 or later
Thank you for using WBS! This update contains minor bug fixes to improve your experience. We have fixed some minor issues reported by our users to ensure the app runs smoothly. As always, we value your feedback and are committed to providing you with....